Dump trailers for roofers
About 18 squares of tear-off per 7x14 load. Weekly at $549 on account, 10% more off three or more units. And nail flats are on us.
Squares per load
| Roof size | 7x14 loads (est.) |
|---|---|
| Up to 18 squares | 1 |
| 19–36 squares | 2 |
| 37–54 squares | 3 |
Shingle tear-off weighs about 731 lb per cubic yard, so a full 7x14 is about 5,200 lb. Two-layer roofs and wet debris weigh more. Run your roof in the load calculator.
Roof Day
7x14 for the day plus a second-load dump run, tarp included. $229 ($242.74 with tax), plus landfill scale fees at cost.
Tires
Nails find tires on every tear-off. We treat a nail puncture as normal wear and tear, so we don't bill you for it. Every unit has a spare we'll send with you on request. If a tire goes flat, get fully off the road. Put on the spare if we sent one with you, then call us right away at (443) 766-0027. Sidewall cuts, curb damage and running on a flat are still damage.
Where shingles go
Howard's Alpha Ridge charges $106/ton. Baltimore County caps shingles at 2 cubic yards at $200/ton. Check the county guide before you load.